Tuesday 12 November 2013

Finally at lining stage

Finally we have had an inspection from Tyrells and the statuory authority. There are a few minor things but our SS is attending to that.

Airconditioning drama is over, they had to move the wardrobe in Bedroom 2 to the other side of the room, but at least there will be a usuable wardrobe. The upstairs rumpus is now quite small as they had to put two stack points in together with a bulkhead but at least that will gives us some storage space (bookshelves).

Here is two recent photos taken over the weekend


The porch beam has been painted the wrong colour. It should be ironstone, not surfmist.