Sunday 21 July 2013

Formwork and Slab

The slab was laid on Friday 19 July. The concreters started work at 7.30am and they only had one hour left of work in the afternoon and it started to rain. The SS mentioned that he will have a look at the slab on Monday and they may have to grind the garage slab  before the brickwork starts and towards the end they may have to top up the garage slab.





Monday 15 July 2013

Update

A before (Friday July 12) and after
Sat (July 13) shot



and today we have piers !






Wednesday 10 July 2013

Rain Rain go Away

Received an email from our SS saying he went to the site yesterday and it is too wet!!





Tuesday 9 July 2013

And the rain starts again

 Site is still too wet to work on according to the concreteron Friday.  We went there on the weekend and it  dried up a fair bit but there was still water on some spots.

And now being Tuesday,  guess what it start to rain again today so I think we will be waiting a long time for a dry site.

Friday 5 July 2013

No action on the block - too wet

Have not heard from our Site Supervisor this week so I thought I should send him an email asking what is going on. Have driven past the block and all that has happened this week is a fence.

The reply was

I have spoken to the concreter, they have been keeping an eye on the site and will start when they think it will be Ok to put the excavator in without causing too much damage, they are concerned with the area holding water and also the filled area as when they have the machine turning around it will damage the platform too much and result in high additional costs for them in concrete.

I will let you know when they expect site start.


Drove past the block today and there is still a bit of water but it is slowly draining. It is supposed to rain next Tuesday so lets hope the weather forecast is wrong.