AND WE MAY HAVE THE KEYS IN THREE WEEKS (10/3)

Met with our SS on Monday and he said PCI may happen in two weeks (3/3/14) and the keys the following Monday (10/3/98). This is dependent on the weather next week when our driveway is scheduled to be poured.

Funny, first day Eden Brae were on site was my second son's birthday and we may get the keys on the my eldest son's birthday.

Here are some pics from the other day:
Bedroom 5 bamboo flooring





Kitchen with splash back which will be changed


Bamboo flooring - multi room



New kitchen splash back - 600 x 600 porcelain  against existing splash back - which one do you prefer - either you like the mosaic tiles or you hate it. Everyone seems to have their own opinion. I personally don't like it. 




Bamboo flooring view of stairs


Bamboo flooring view of multi area downstairs


Ensuite - all mopped and cleaned but still waiting for SHOWER SCREEN


Main bathroom vanity - will be adding feature tile post handover
Still waiting for mirror - incorrect size delivered


View of multi - photo taken from upstairs


Still waiting for two shower screens, one mirror for main bathroom, carpet will be done next Tuesday and will have to ask our supervisor about skirting boards as I still think they are tacked on after the floorboards. Our kitchen splash back is to be redone as there was a design issue with our window and selection of mosaic tiles. Not happy with the way it turned out but hopefully it will be fixed before we move in.


Wednesday, 18 December 2013

Photos from inspection today


Stairs - view from upstairs rumpus




I don't know how the electrician will install our large light fitting in the central staircase area





Finally - garage doors before Christmas




Downstairs powder room - wasn't expecting wall tiles to be used on hob
but apparently that is EB standard




Upstairs ensuite - wall tiles used for hob again


Upstairs ensuite - vanity



Main bathroom


 Main bathroom - wall tiles for shower hob




Very happy with our kitchen - can't wait to use it - lots of storage and gas cooking and love the feature window





Saturday, 16 November 2013

Gyprocking is up - some photos


Entrance


Main living area - room for future fireplace


Kitchen - pantry and fridge space


Dining area


Home theatre with bulkhead


Multi room - with room for staircase


Bedroom 5 - downstairs (at front of house)


Upstairs rumpus - with bulkhead


Main bathroom


Main bathroom - shower niche


Main bedroom



Bedroom 2 - upstairs front of house


Tuesday, 16 April 2013

Final PCV or not?

Just received a PCV from Melanie for Di Lorenzo flooring - but they forgot to add the kitchen splashback and extra tiling for main bathroom. You really have to check everything as this was to be our final PCV....maybe not? Luckily we spotted this otherwise we would have no kitchen splashback or extra tiling in the main bathroom

Sunday, 7 April 2013

Bathroom selections

We will be having three bathrooms - one downstairs and an ensuite and main bathroom upstairs. The only upgrade was in the main bathroom - we will be tiling higher around the bath to line up the tiling above the vanity (extra cost of $90.30)

Bathroom downstairs


Vanity will be 900m single vanity with laminex pure calcite benchtop and blackened limewood door. Here is a photo from a display home with similar colours:



Ensuite upstairs




Ensuite Vanity will be a double basin with Laminex pure calcite benchtops and blackened linewood doors. Similar to this picture from a display home



Main bathroom upstairs



Main bathroom will have a double basin with Laminex pure calcite benchtop and polar white doors.

Fingers crossed these tiles will not be discontinued when we get to tiling stage

Vanity will be standard except we decided on drawers for the ensuite vanity at an extra cost of $352.00