Building with Eden Brae Heathcote35

After moving to Newcastle from Sydney in 2012 we decided to take the plunge and build our dream home. We are a family of six and after countless trips to display homes, a modified version of the Heathcote 35 was the perfect choice. Now the fun begins.....

Pages

  • Home
  • Photos
  • Plans
  • Contract Time Line
Showing posts with label Plans. Show all posts
Showing posts with label Plans. Show all posts

Tuesday, 4 June 2013

FINAL PLANS

Here are our final plans.





Posted by Unknown at 10:28 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Plans

Saturday, 6 April 2013

Modified plans of the Heathcote 35 Balmain facade

Modified version of Heathcote 35 - Balmain  facade


Posted by Unknown at 17:45 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Plans

Elevation plans


Posted by Unknown at 17:25 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Plans
Older Posts Home
Subscribe to: Posts (Atom)

Labels

airconditioning (6) bathroom (5) Bricks (5) colour selection (2) flooring (3) frames (3) kitchen (5) land (1) lighting (2) photos of build (1) Plans (3) Roof (3) Slab (1) Stairs (4)

Blog Archive

  • ▼  2014 (12)
    • ▼  June (2)
      • Landscaping photos
      • TWO MONTHS AFTER SETTLEMENT
    • ►  March (4)
    • ►  February (5)
    • ►  January (1)
  • ►  2013 (55)
    • ►  December (2)
    • ►  November (4)
    • ►  October (6)
    • ►  September (7)
    • ►  August (8)
    • ►  July (5)
    • ►  June (8)
    • ►  May (1)
    • ►  April (14)

Timeline

  • 05/10/13 electrical rough in started
  • 27/09/13 lower roof
  • 23/09/13 front portico
  • 11/09/13 upper eaves installed
  • 11/09/13 upper bricks finished
  • 27/8/13 Upper roof tiling begins
  • 22/8/13 scaffolding done
  • 21/08/13 ground floor bricks finished
  • 16/08/13 bricklaying started
  • 08/08/13 top floor frames, window, roof trusses
  • 07/08/13 ground floor windows and flooring system
  • 03/08/13 Ground floor frames
  • 23/07/13 external drainage
  • 19/07/13 slab laid
  • 18/07/13 drainage, pods, formwork completed
  • 17/07/13 drainage, pods delivered
  • 16/07/13 formwork
  • 15/07/13 Piering and portaloo delivered
  • 25/06/13 Excavation of site
  • 20/06/13 Administration complete
  • 14/06/13 Contract officially begins
  • 17/05/13 survey pegout
  • 16/05/13 holding deposit received, site start appointment
  • 01/05/13 construction certificate
  • 11/04/13 council approval
  • 05/04/13 kitchen selection
  • 22/03/13 engineer drawings signed
  • 04/03/13 water board approval
  • 04/03/13 electrical selection
  • 14/02/13 colour selection
  • 12/02/13 basix approval
  • 04/02/13 building contract signed
  • 31/01/13 building contract appt
  • 07/01/13 tender signed
  • 18/12/12 land settlement
  • 17/12/12 tender appt
  • 10/12/12 soil report
  • 05/12/12 contour survey
  • 25/11/12 initial deposit
  • 06/11/13 Tyrells and stat. inspection
  • 08/11/13 insulation
  • 25/10/13 airconditioning